How Does BC’s Energy Step Code Work?
You’re not alone. Step Code requirements vary by municipality, involve complex calculations, and require documentation most builders seldom deal with.
Step Code Basics
BC’s Energy Step Code is intentionally flexible—which makes it complex:
Not One-Size-Fits-All
BC Step Code sets energy efficiency targets that can be met through overall performance of the building. For example, a performance target allows flexible choices of insulation levels for foundations, walls, windows, and ceilings as long as overall R value targets are met.
In contrast, a prescriptive approach would define R value minimums for each element as per the building code.
Municipality Control
Municipalities can choose to require Step Code levels above the BC provincial minimum, and whether exceptions apply. You need to know the rules for each area where you build. Rule changes by municipalities are not infrequent, but usually the rules in place upon a building permit’s approval apply to the project until completion.
Look up current requirements for your municipality in our Step Code Requirements by Municipality reference.
Performance-Based
Performance goals require the Energy Advisor to model the design and model and test the building to ensure goals are met. BC Municipal requirements vary, but include some of the following metrics:
- Energy Step Code
- Zero Carbon Step Code
- City of Vancouver Energy Checklist
- Embodied Carbon Design Code
Three-Stage Process
1. Pre-Construction Energy Model from plans (required report submitted with permit application)
2. Mid-Construction site visit and air tightness test (report required in some municipalities, optional in others)
3) As-Built validation of Energy Model and air tightness test (report required for occupancy permit)
Technical Complexity
Heat loss calculations, airtightness projections, mechanical system sizing, and energy modeling require specialized knowledge and software.
ARG Energy Advisor’s Role
Confirm Step Code and Report Requirements
Each municipality has one or more combination of Energy and Zero Carbon Step Codes which will determine the choices for exterior envelope and mechanical equipment.
Client Consultation
Match Client goals with design options for exterior building envelope and mechanical components.
Stage 1: Energy Modelling
Complete detailed energy model from plans using industry standard HOT2000 software and discuss outcomes and options with client. Update energy model as required to meet Step Code requirements and client home comfort goals.
Stage 2: Mid-Construction
Review all exterior building envelope components and re-model to endure targets are met. Pre-drywall Blower door test to determine ACH and find and mark air-leaks to remedy. If required, produce mid-construction reports for municipality. Full house fogging option available for leak detection.
Stage 3: As-Built Compliance
When construction is complete, we validate all components of the build, conduct blower door testing to ensure targets are met, and verify final compliance documents for occupancy approval.
BC Step Code Compliance
Want to learn more about Step Code Compliance?
Our Solution
ARG Energy takes the confusion out of Step Code compliance so you can focus on building.
Requirement Clarification
We tell you exactly what Step level and documentation your specific project needs based on municipality and building type.
Energy Modeling
We create the required energy models using industry-standard software, ensuring accuracy and compliance.
Technical Calculations
Optional CSA F280-12 heat loss calculation available as required by code.
Compliance Documentation
You receive a complete, organized package ready to submit with your permit application.
Municipality Liaison
If questions arise during permit review, we respond directly to keep your application moving.
Construction Support
During construction, we’re available for questions and can verify your building stays on track for compliance.
Final Verification
We conduct blower door testing and provide final as-built verification for occupancy approval.
Why Choose ARG Energy
ARG Energy specializes in simplifying Step Code compliance for builders throughout Greater Vancouver and the Sunshine Coast. As NRCan Registered Energy Advisors, we handle all energy modeling, calculations, and documentation—ensuring your permits get approved without delays.
Clear Communication
Practical Solutions
Comprehensive Analysis
Ongoing Support
What Our Clients Say
Get Your Permits Approved—First Time
Don’t let Step Code compliance slow down your project. We ensure your documentation is complete, accurate, and municipality-ready.